Bring your best ideas to the AI Use Case Contest! Enter to win 40 hours of expert engineering support and bring your vision to life using the powerful combination of Alteryx + AI. Learn more now, or go straight to the submission form.
Start Free Trial

Alteryx Server Ideas

Share your Server product ideas - we're listening!
Submitting an Idea?

Be sure to review our Idea Submission Guidelines for more information!

Submission Guidelines

Featured Ideas

While in a workspace or collection, it would be great to be able to select multiple workflows and perform a bulk action on them (e.g. delete). This would help cleaning up unused workflows quicker.

Thank you

0 Likes

Hello,

 

In our environment, we decided to do not use the Data Connexion from the Gallery for internal security reason.

Then we use the internal Designer in the Server to create (IT Teams) all the BDD Connexions for our workflows (In Memory and In DB).

Our Curators (not in IT Teams) has only access to the Gallery and not directly to a Server but it's responsible of these conenxions.

 

I checked all the API and we cannot retrieve the list of our "In DB" Connexions.

 

Is possible to have a new API to list all these connexions or to have an update of the existing API /admin/v1/systemdataconnections ?

 

Thanks !

 

Alteryx Server does not presently support any file encryption systems. Many people need to encrypt there Fileshare as a secure measurement and use safeguard lan encrypted. Please provide a solution so workers are able to read and write encrypted files through safeguard lan encrypted.

In the example given, there are four scheduled jobs running in the server at the moment and one manual job is being triggered by the user and is in a queued state for more than 30 minutes to start running. However, in MongoDB, when a job is triggered, that time is captured as the start time (not considering the queue time). If we consider the start time of As_Queue in our workflow, we ended up with a mess. Since that manual job is queued for 30 minutes and running for only 3.30 hours, it is being killed by our workflow. It should only be killed after 4 hours.  

 

  • How did we determine the total queue time & the execution start time for the running/queued jobs? 
  • How do I kill this job automatically after four hours while taking queue time into consideration? 
  • Is there any other way to kill the manual jobs after four hours? Please note that scheduled jobs will be killed automatically by the system after four hours.

Greetings Server friends!

 

I was talking with @KevinP in the Solutions Center at Inspire and we talked a lot about how Server has been evolving over the last several versions. I'd like to request that end users be able to select workflows or applications shared with them as "Favorites." It would be great for ServerUI to offer a separate section for these selected "favorites" so that the end users can have a single go-to place to access their most frequently used apps.

 

 @JohnPelletier 

  • New Request
0 Likes

Hello,

My customer want to set a certification process for the workflow or application published on gallery, on the same model than Tableau has for datasource :
https://help.tableau.com/current/online/en-us/datasource_certified.htm

 

Best regards,

Simon

I would like to suggest the idea of being able to handle row-level security data sources in a more seamless way using Kerberos passthrough, where Alteryx Gallery will pass the information that User A is running the workflow to the underlying DB and will authenticate as User A. 

 

We have many workflows that are built to handle different queries of a database that are reliant on knowing who is running the workflow in Gallery. We also have many regional workers, and we want to keep the administration of these connections to the data as simple as possible. 

 

For more information, check out the Community thread on this subject.

It would be nice if the Gallery Admin could download the workflow from the workflow page within the UI, without having to run API calls or having to add himself temporarily to someone else's studio. 

Hello,

 

It would be beneficial to have integration between Alteryx and SIEM solutions, and  send all Alteryx logs to the SIEM solution just like any other IT solution. The reason is to comply with the policies of customers, where InfoSec team must have centralized logging for all systems and hence a holistic view of the security posture for the infrastructure.

 

An Example of this would be seeing logs concerning change of user privileges' and system settings (on the SIEM).

For our large organization a requirement is that the Server connect to MongoDB cluster requiring keytab kerberos authentication. Can we please upgrade to needed MongoDB version that would support this as well as enable it within Alteryx Server.

 

(https://docs.mongodb.com/v3.2/tutorial/control-access-to-mongodb-with-kerberos-authentication/)

0 Likes

When I manually execute a wf on Gallery, I sometimes have a tinge of regret that I don't have email events set for the workflow. In most cases, it's just THIS time that I want to receive an alert and not every time. At any point while the workflow is executing, allow the option to request an email event to be sent out for this execution.

When we upgrade a server - we often want to do this progressively so that we can move a few canvasses to the new version over time.
However - in order to do this we need to create an entirely new server URL and then users have to deal with the irritation and complexity of storing multiple addresses and knowing which one is where.

 

This would be substantially easier if we could put a load balancer / a consolidator in front of the alteryx server - so the user can go to the same gallery - but under the covers some of their stuff has been upgraded to the new version (on a new server) and some is still on the older server.    

As we look at upgrading Alteryx Server - one of the challenges is that it's an all-or-nothing approach; and there doesn't seem to be a guided wizard approach to upgrading.

 

The upgrade process would be much less intimidating if we could create a Migration tool which can work across versions - similar to Microsoft SQL Server which has the.    This would allow us to:
- Migrate a subset of assets up or down versions

- Migrate across servers to do consolidation or to split loads into different servers for the purpose of segregation

- Progressively migrate over time to limit the risk.

 

cc: @JohnPelletier 

 

 

 

 

 

Hi Team,

 

We have new idea which we dint find on Alteryx community, also Alteryx expert confirmed for now this is not possible.

 

Please find the below details:

 

Use Case: Automating Onboarding Process for collection creation.

 

Idea: Currently we are doing this onboarding manually, such as user fills up the form in Sharepoint with all relevant details for Collection Creation.

We as an Alteryx Support team, check the form and create the collection Manually.

We want to create a Workflow, such that it will read the form from SP and create the Collection Automatically without any Manual user intervention.

 

Benefits: If we Automate this then we can save manual user efforts and also avoid any manual mistakes.

 

Note: If this can be possible with any other feature of Alteryx like API, then also we are good.

 

Regards,

Niharika

 

I'd like to request the ability for the Curators to change the priority on Apps in the Gallery.

 

Today we have a system where users are not allowed to set the priority on workflows. The Curators change the priority of scheduled workflows based on workflow runtime/ business need by going to Gallery Admin> Jobs> Scheduled Workflows, and then editing the schedule priority.

 

The problem that that we have a numbers of Gallery Members/ Viewers that run Apps through the day that are very fast to run, but depending on how big is the queue they can several minutes/ hour until a spot is free to run.

 

If would be very helpful to get a better UX if the curator can choose which apps should have a higher priority to run.

 

Thanks,

 

Mauricio Estevez

System Administrator should be able to configure portal pages be being able to choose the columns, columns widths, and sort order.  For Example  in the collections view,  there are columns Inight Count, User Count, Studio count which add no value to my user community.  Yet the name column is not wide enought to show the full names. The collect page is sorted by Create Date which does not add value and once you get above 20 collections  

 

The recommendation would be to allow System Admins to be able to change these settings.  If the definations are stored a json or xml file or some other file that can be edited, allowing for the customizations.  Admins would edit at their own risk working with in parameters and documentation provided. 

 

 

  • New Request
0 Likes

Currently, if we want to assign a worker node it has to be done at the workflow level.  It would be very helpful to be able to make a rule that auto-assigns the type of workflows to a specific node, so all apps go to one, all schedules go to another, etc.  

 

At the very least, if there was an API endpoint to update specific items on a workflow (such as node), this would work as well as we could then build a process that auto-assigns.

 

Thanks! 

Currently, Alteryx Server lacks rich job scheduling functionality to other products like Control-M and Informatica's Scheduler

 

Feature Requests:

 

1) Ability to configure job retries on failure without having to rerun the workflow based on a  event trigger: https://community.alteryx.com/t5/Alteryx-Designer-Knowledge-Base/How-to-run-a-workflow-from-an-event...

 

There are common occurrences where a workflow may fail to connect to Input sources and a retry would normally resolve the issue. 

 

2) More user friendly way to setup dependencies between scheduled workflows.  For example, if workflow A fails it triggers workflow B to run.  If workflow B runs without errors, it triggers workflow C to run.  Currently, we would need to configure this based upon events.  A complex chain of scheduled workflows becomes difficult to manage and scale.

 

One of our Server customers has a need to disable all schedules temporarily across all worker nodes.  I do not see an easy way to do this unless we go into each worker's settings and disable from there, but this is not ideal.

 

The reason is for scheduled maintenance windows during a large upgrade or migration.  Currently stopping the Alteryx Service on each worker is time consuming.

 

Thank you! 

0 Likes

More of our customers (we are a premier partner) have Servers with multiple worker nodes.  If a custom macro is needed, currently it has to be added manually on each worker node. 

 

Would love to see a feature in the Admin portal that allows for the upload and distribution of custom macros to all or select workers. 

Top Liked Authors