Be sure to review our Idea Submission Guidelines for more information!
Submission GuidelinesHello all,
This may be a little controversial. As of today, when you buy an Alteryx Server, the basic package covers up to 4 cores :
https://community.alteryx.com/t5/Alteryx-Server-Knowledge-Base/How-Alteryx-defines-cores-for-licensing-our-products/ta-p/158030
I have always known that. But these last years, the technology, the world has evolved. Especially the number of cores in a server. As an example, AMD Epyc CPU for server begin at 8 cores :
https://www.amd.com/en/processors/epyc-7002-series
So the idea is to update the number of cores in initial package for 8 or even 16 cores. It would :
-make Alteryx more competitive
-cost only very few money
-end some user frustration
Moreover, Alteryx Server Additional Capacity license should be 4 cores.
Best regards,
Simon
Experts -
I think the user experience in the "Workflow Results" area could be vastly improved with a simple tweak: rather than having 1 record per job we could have 1 record per workflow, with the ability to then expand each workflow to see all associated jobs, and then expand each job to see all the associated messages.
Even better: add the ability to toggle sorting by job or workflow!
Most of the time I need to find a particular job (and we may run each workflow a lot during testing) so seeing a long list of workflows with the same name is sort of clunky, and then having to go page by page looking for the job in question makes it even clunkier.
Thanks for the consideration!
I think it would make sense to let user have more flexibility when they want to schedule.
For instance, we should be able to set a schedule every 2 hours for a certain time range on certain days. EG : Every 2 hours from 8am to 6pm from Monday to Friday.
Right now, this is not possible.
Hi folks
There are quite a few very useful Alteryx items I have been using recently that I have found on the help pages / public gallery. However, when I searched for them, I didn't quite use the correct search terms so this took longer than I had hoped and I was on a tight deadline. An example is the "Server Pre-Upgrade Checks" workflow used during Server upgrades.
My idea is to put these utilities in the Download portal in the same way that the Server Usage Report is.
Of course, there should be a limit as to what goes in there but, like the Server Usage Report can be done on a case-by-case basis.
Cheer, jonna