Assigning Work by Location and Capacity
Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Mute
- Printer Friendly Page
johnmatta
6 - Meteoroid
‎01-19-2023
10:16 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
I am attempting to assign work, prioritized by highest value, to employees based on their capacity limit and location. Some employees may overlap with one another by area and I want to distribute work fairly (as equally as possible based on availability). I have been struggling to build a reliable solution. Example tables attached.
Thank you!
Labels:
- Labels:
- Join
- Optimization
- Workflow
1 REPLY 1
blessonmatthew
7 - Meteor
‎04-03-2023
10:21 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
