We are celebrating the 10-year anniversary of the Alteryx Community! Learn more and join in on the fun here.
Start Free Trial

Alteryx Designer Desktop Discussions

Find answers, ask questions, and share expertise about Alteryx Designer Desktop and Intelligence Suite.

Assigning Work by Location and Capacity

johnmatta
6 - Meteoroid

I am attempting to assign work, prioritized by highest value, to employees based on their capacity limit and location. Some employees may overlap with one another by area and I want to distribute work fairly (as equally as possible based on availability). I have been struggling to build a reliable solution. Example tables attached.

 

Thank you!

1 REPLY 1
blessonmatthew
7 - Meteor

Attached might help you to an extend. Macro is created in a way to Assign work based on availability of time.

Labels
Top Solution Authors