Hi All,
is this report possible to achieve in Alteryx Designer?
- The output should be in a PDF or Power Point.
- Can the PDF or Power Point reports sent via email and can this be scheduled using Alteryx Gallery.
- column A and B are static values.
- RAG and Month End Date should be dynamic based on underlying changes to data.
- RAG limits below the table are static values.
if anyone has a sample workflow similar to RAG reporting please do share for reference.
Thanks