Missed the Q4 Fall Release Product Update? Watch the on-demand webinar for more info on the latest in Designer 24.2, Auto Insights Magic Reports, and more!

Weekly Challenges

Solve the challenge, share your solution and summit the ranks of our Community!

Also available in | Français | Português | Español | 日本語
IDEAS WANTED

Want to get involved? We're always looking for ideas and content for Weekly Challenges.

SUBMIT YOUR IDEA

Challenge #3: Running Averages

BrianJohnson
Asteroide

I am submitting a different output presentation.  To me, the goal was to present a 3 and 6 month average by those named columns and RM category.  When I look at the provided solution output, I didn't see that as the result and the RM category was mixed in with the various type of values.  

 

I'm presenting two displays in which I'd rather see the data.  Sorry....

Rob-Silk
Asteroide

Challenging target output to interpret and similar to some others I have chosen to display the output differently as I feel it is easier to understand.

My solution:

Spoiler
challenge_3_RS_screencap.PNG
B_SarkadiNagy
Meteoroide
Spoiler
 

2023-12-05_13h30_21.png

Shoujain
Meteoro

Here is the solution

Aratryn
Meteoro

The provided solution doesn't seem to match the brief as the 6m average isn't grouped by RM Category (though the 3m average is).

nSpire
Cometa
Spoiler
003.png
albracht7
Meteoro

Solution

snbandi
Asteroide

My solution

Krzysiek
Asteroide

MySolution

asultanov
Asteroide

Solution attached.