Hello.
I am trying to connect Alteryx with Power BI with the tool "Power BI Output", but when I run the pipeline I get the errors:
Requerid fields cannot be empty
Error using AMP engine
Although, I am filling all blanks that Alteryx asks me to fill.
I upload an image with more detail.
Hope you can help me, please.
Thank you.
Edwin Lee
Hey,
If previous steps did not help, the last thing that i might recommend - In the user settings, on the General tab, select Override DCM Setting and change the DCM Mode to DCM Optional.
If this will help, then i suppose there are some problems with Alteryx. But you still can ask the guys directly by the link that i provided in previous comment.
User | Count |
---|---|
106 | |
85 | |
76 | |
54 | |
40 |