Hello.
I am trying to connect Alteryx with Power BI with the tool "Power BI Output", but when I run the pipeline I get the errors:
Requerid fields cannot be empty
Error using AMP engine
Although, I am filling all blanks that Alteryx asks me to fill.
I upload an image with more detail.
Hope you can help me, please.
Thank you.
Edwin Lee
@edwin_lee_2025 , @frank58richard
Have you tried to untick the AMP Engine? Click on Canvas, Go to Runtime, scroll down and untick Use AMP Engine.
The Power BI tool might require AMP engine to be enabled. This might not be an error with AMP engine, it might be something funky with the configs or a field you are passing through is getting cleared for some reason. Can you post the workflow to this thread?
Could you upload the entire workflow or a screenshot of the Power BI tool configs? Sorry for the confusion.
Thank again for your reply.
Could you please give me more detail about the configs you want to see?
Regards.
Edwin
The settings for the Power BI tool. I am wondering if a field is missing in the configurations of the Power BI tool that is throwing that error. The Power BI tool requires AMP engine to be enabled so I am thinking the error has to be around the configurations. I haven't used that tool specifically but I have used the Tableau output tool extensively, they appear to have similar interfaces.
Hello,
I talked to Microsoft Power BI developers from my company about the errors you're seeing with the Alteryx and Power BI. Most of the time, these errors come from setting things up wrong or using data that doesn’t match. Here are some quick tips to help you fix it:
Hope, that will help.
Ivan, thank your for taking the time to make a search about my issue... I really preciate it!
Here the things I did considering your tips:
1) Converted the field "invoice_date" to String.
2) Then, I established the connection with Power BI via Internet Browser.
3) After that, I filled out all the fields I had to: MyWorkspace, New Dataset (I want to create a new one), set the name of the Dataset (proyect) and the Table (data)
4) Finally, I ran my pipeline but I got the same issues:
Could be the reason of the problems the fact I am using a Free Count of Power BI?
Because as you see I did all the things you told me.
Thank you again.
Regards.
User | Count |
---|---|
106 | |
85 | |
76 | |
54 | |
40 |