I recently deleted an old database connection in Designer and created a new one. Now I'm facing these issues:
When trying to run my workflow on Alteryx Server, I get this error:
- "Tool #1: Selected Connection is not available. Set one up to use the tool. (ToolId: 10)"
When attempting to sync connections in Designer, I receive:
- "Subobj does not exist" error
What's Strange
- The workflow runs perfectly in my Alteryx Designer
- The same workflow runs successfully on Server when my colleague executes it
- I can't see my new connection in Alteryx Server under data sources
- The connection doesn't seem to be syncing between Designer and Server
What I've Tried
I've attempted to sync the connections but continue to get the "Subobj does not exist" error.
Has anyone encountered this issue before? What's the proper way to ensure new connections created in Designer properly sync to Server? Is there something I'm missing in the connection configuration or permissions?
Any help would be greatly appreciated!