I am attempting to assign work, prioritized by highest value, to employees based on their capacity limit and location. Some employees may overlap with one another by area and I want to distribute work fairly (as equally as possible based on availability). I have been struggling to build a reliable solution. Example tables attached.
Thank you!
User | Count |
---|---|
108 | |
89 | |
78 | |
54 | |
40 |