Alteryx Designer Desktop Discussions

Find answers, ask questions, and share expertise about Alteryx Designer Desktop and Intelligence Suite.

Sequence of Containers

RE5260
8 - Asteroid

Hi Experts,

 

There are more than two containers in my workflow.

 

How can I implement the workflow in my way so that Container 2 runs after Container 1?

 

Please give an example along with the sample workflow.

3 REPLIES 3
MoinShaikBasha
7 - Meteor

Is there a connection between Container 1 and container 2 ( I mean data passing)? then in this case you can convert the second container as macro and it will run after container 1. See if this helps.

 

Raj
14 - Magnetar

add Block until done tool after container 1

caltang
17 - Castor
17 - Castor

To dictate a container's execution sequentially, I think you're referring to a Control Container. These links have the samples:

Calvin Tang
Alteryx ACE
https://www.linkedin.com/in/calvintangkw/
Labels