Challenge #140: Prove the Birthday Paradox!

neilgallen
Quasar

Started down a macro route and then just abandoned it for the brute force method. One I'll come back to when I have more time to work the iterative macro out.

 

Révélation
matching birthday.PNG

birthday scatterplot.PNG

ThoreKonrad
Atome

75% @ 33

90% @ 41

ggruccio
ACE Emeritus
ACE Emeritus

Thought it would run faster based on tests, but it worked!

Birthrate.JPG

Révélation
My solution involved a combination of batch and iterative macros.140_a.JPG140_b.JPG140_c.JPG

 

OliverW
Alteryx Alumni (Retired)

Here is my solution for this weeks challenge.

 

Révélation
Went the way that one can configure how many trials they want to run, so basically I created a Batch Macro to be able to run multiple iterations of the actual process and then put this Batch macro into a regular macro where the user can directly influence the number of trials.

Final Workflow:
grafik.png

Regular Macro to influence number of Trials:
grafik.png

Batch Macro to run the actual process multiple times:
grafik.png

Hary
Météore

Hmm...I know it's not perfect.

 

キャプチャ.PNG

Révélation
MainWorkflow.PNGMacro.PNG
olivia_paquot
Astéroïde

Done !

jparcinski
Météoroïde

 

 

The program is way too slow, but I completed it using nested iterative macros. Also in bigger groups the probability rises a little bit faster and the last few observations have probability equals to 1.

 

 

 

Plot.PNG

JoeS
Alteryx Alumni (Retired)

I went down the route of allowing the data to explode a little rather than the macro route.

 

To be above 75% chance I was getting either group size 32 or 33.

Above 90% was 41 and above.

Plot.png

 

Révélation
Workflow.png
jackieheer
Astéroïde
 
OliverW
Alteryx Alumni (Retired)

Why do you think its slow? So my solution just ran 10000 Simulations in 1:11 (as I configured mine in the way that I just have to enter how many simulations I want to run), haveing an i7 with 16gb ram, so I did not feel that was slow. The recommended 1000 it runs in 8 seconds.

 

By the way, I gotta say, the more simulations you run, the nicer the curve looks like, so 10000 already gives me a very nice shaped curve with almost no breakouts in between.

 

Révélation
See here the curve after I just ran 50000 simulations in 8 minutes
grafik.png

 

 

 

 

 

 

Cheers

Oliver