Hi,
I am trying to upgrade Alteryx Server from 9.5 to 10.1 but due to a known issue with Windows Server 2008, Alteryx suggests to uninstall existing version and do the installation.
Would like to understand how the job schedules can be preserved in such case and if there is a way to back up and restore them, what are the steps to perform that?
Looking for your inputs.
Thanks,
Vijay