Hi all,

 

I am currently working on a project and we are planning to use Alteryx for data preparation. The team is very pleased with the tool as we were able to transform our data easily with it. The only thing that we are worried about is its deployment in our environments.

 

We are aware that Alteryx has its own scheduler and we have tried it but we see no option in the scheduler to integrate with other scheduling tool.

 

What we are planning to do is to trigger the Alteryx workflows using control M as we have existing jobs in control M that should be finished first before executing the Alteryx workflows. Is this possible?

 

Thanks in advance.

Mhiko

11 REPLIES 11
KaneG
Alteryx Alumni (Retired)

This will be put at the end of the queue. We only introduced priority scheduling in the last 6-9 months and I don't believe that we've adjusted the CLI to cater for priority 

jasonMMedina
7 - Meteor

Thanks @KaneG - is priority scheduling available with 2018.2 or possible from CLI?

 

For context, we have real time reporting workflows that run multiple times per hour in Server/Gallery.  We want to these real time workflows to take priority in the queue.  Any suggestions on the best way to accomplish this?