Alteryx Designer Desktop Discussions

Find answers, ask questions, and share expertise about Alteryx Designer Desktop and Intelligence Suite.
SOLVED

Rolling Average Based on Dates

slinky123
7 - Meteor

Hi,

 

In the attached, how do I get Alteryx to replicate the calculations in columns E and F?

 

I want a 12 day rolling average based on the date in column A for both actual and contracted hours.

 

In the future, I need to do the same for an 84 day average so please bear that in mind :-)

 

Thanks a lot in advance,

Scott

 

 

5 REPLIES 5
MarqueeCrew
20 - Arcturus
20 - Arcturus

@slinky123 ,

 

Have you found the CReW macros (Download Here) available from http://www.chaosreignswithin.com/p/macros.html.

 

There's a moving Summarize that should help you.

 

Cheers,


Mark

Alteryx ACE & Top Community Contributor

Chaos reigns within. Repent, reflect and restart. Order shall return.
Please Subscribe to my youTube channel.
sjm
8 - Asteroid

Check out the Moving Summarize tool in the CReW Macros: http://www.chaosreignswithin.com/p/macros.html

Select the Actual Hours field, use the Average summarize method, make Rows back = 11 and Rows forward = 0. Add the tool again for the Contracted Hours.

 

Someone may have another method but this is a really simple approach!

slinky123
7 - Meteor

Thanks so much for coming back to me. How would I incorporate the payroll no (as there are going to be thousands of them, all with different hours) in this case?

 

slinky123
7 - Meteor

Managed to sort this in the end. Thanks for your help!

edineshkumar_it
5 - Atom

Hi

I tried the below logic for the given data and it works. I see some dates were missing in between and the average is still calcuated for the given dates , and not the actual calendar date.

 

Labels