I would use Control Containers instead! https://community.alteryx.com/t5/Engine-Works/Control-Containers-Take-Control-of-Your-Workflow/ba-p/...
Hey Alex, I dont see the option of Control Containers in my Alteryx Designer 2022.3
any other solution please @alexnajm
Ah ok, your version is too old - you need 2023.1.
in that case, you can connect the block until done tools to each other. I would connect two of the outputs to the first two anchors of one block until done tool, but then out of the third anchor you would connect a second block until done tool. You can cascade like this as much as you need
I tried that - didnt realy work
Show us then with a screenshot - you will likely also need AMP engine turned off to be safe
Here’s showing a solved solution: https://community.alteryx.com/t5/Alteryx-Designer-Desktop-Discussions/Block-Until-Done/td-p/895920
you can also download the crew macro Parallel Block Until Done and stack those
Thanks @alexnajm managed to get 6 sheets - ill keep tryin the below