Hi, guys. I'm the budget allocation guy on last Wednesday if you remember. I need more help on the workflow. Now, I'm able to allocate the budget thanks to the fraction method given by Mr. Gawa. But currently, I want my workflow to be able to allocate in more specific numbers aside fractioning. So, I would like to ask how can I modify the workflow to achieve this result?
The current result is like this
I want it to be like
Solved! Go to Solution.
NVM, I finally did it!
This problem need to solve indeterminate equation> One way is to use Optimization tool.
As this is your assignment, I cannot share my solution directly but I can advise:
- Dividing values by 50,000(if round value to $50,000 wise), and simplify the value
- Define the variables and its constraints and range of its value
(target value seems within $50,000-$250,000, that is equal to 1-5 in range configuration).
If you are not familiar with Optimization tool, please start to study about it. I think you can find good resource in Alteryx Community or simply Google search.
A part of configuration of Optimization tool for your reference.
Thanks for your useful guidance yet again. Even though I already figured it out myself. I will try to see if I can apply ur suggestion to my workflow.
If allowed, can you tell me how did you realize it? I could not come up with idea other than using Optimization tool.
As I'm not familiar with WDM model, I'll look into it more. Thanks.
User | Count |
---|---|
17 | |
15 | |
15 | |
8 | |
6 |