Hello,
I'm experiencing issues when I use the Block Until Done tool and the Power BI Tool together.
My workflow starts with the extract of several SAP Tables through the DVW ACS Connector.
Tables are joined altogether before facing some data processing procedures through several workflow streams, separated with Block Until Done tools.
If AMP Engine is activated, the Block Until Done gives a "memory limit" message and the data are stopped there.
If AMP Engine is deactivated, the Block Until Done doesn't give any problem, but the PowerBI Tool doesn't work because it needs the AMP Engine to work.
Do you have any suggestion on how to solve this?
Thank you,
Alberto