Hi all,
I have a production data. I'd need to find out the OEE1, OEE3, and MBTF values that came within 24 hours of the Actual Start and Actual Stop.
We should consider the timeframe between 'Actual Start' from 10:30 A.M of the current day until 10:30 A.M ('Actual Stop') of the next day.
The formulas to calculate the following KPI's:
OEE1 ==>> Valued Operating Time (mins) / Operating Time (mins)
OEE3 ==>> Valued Operating Time (mins) / Manned Time (mins)
MBTF ==>> Valued Operating Time (mins) / Number Of Stops
The OEE1, OEE3, Valued Operating Time (mins), Manned Time (mins), and Number Of Stops values present in the excel sheet are the actual values as per the batch.
However, in order to achieve real values within 24 hours for OEE1, OEE3 and MBTF, we need to consolidate all the batches within this 24 hour period and find the values of Operating Time (minutes), Manned Time (minutes) and the Number of Stops using the Actual Start and Actual Stop values within 24 hours (10:30 a.m -- 10:30 a.m).. That’s where it was hard for me.
Please help me how to do this.
Thank you.
Best Regards,
Teja.