I have set up a formula to capture the start date ("ArtWorkStartDate"), which requires looking at 3 different dates. There are just over 4300 rows in the output, and this formula worked as I had hoped for all but 4 line items.
The 4 line items are shown above, as well as the formula. As you can see in the output, the ArtWorkStartDate should have been populated with the values in the AltStartDate column (for the first 3) and the TransStartDate column (for the last one) based on the formula. These are the only 4 records with this issue.
This may be something deeper in the database I'm working with, but are there any suggestions / thoughts as to what could be causing this error?