Hello Alteryx Team,
We would like to be scheduling the loaders from the administration console, Connections tab. However, when scheduling from there, the loaders are being sent to the Alteryx Gallery under low priority and therefore can easily end up in a queue. As we are scheduling a number of loaders that run for a significant amount of time, it is essential to have the schedules set on precise times and have a certainty that they will not end up in a queue. However, the low priority in the Gallery prevents us from doing that.
It would be great if there was a priority switch directly in the Connect's Connections section, where it would be possible to select how prioritized should the loaders be in the Alteryx Gallery. Also a possibility to select a specific worker would be greatly appreciated.
Thank you very much for considering this idea.
Regards,
Jan Laznicka