I have 4 advisors who need to be assigned new leads equally then they come in. The workflow is set to run every hour so the number of leads that need assigning varies. For example, it could 1 lead that needs assigning or it could be 10.
The workflow I have set up uses the Tile tool which equally splits the records. This is fine then there is 4 or more as it is split equally. The problem I have is that more often than not, only 1 lead comes in at any one time. This is then always assigned to position 1 in the Tile tool.
I have explored using RandInt formula however when there is more than 1 lead it is not equally assigning them. For example, I could have 10 leads come in and one of the advisors receive none of them.
Does anyone have any ideas of how to get around this issue?
Thanks