Hi,
I have a workflow which has two inputs - Train no and origin as shown in the screenshot. The workflow is ready and has to be run with the input of path 1 for train no and origin for the output of path 1. This has to be done for all 10 paths. Instead of changing input for each path and running the workflow 10 times, how can I use a macro to automate it as I have over 300 paths? Would save considerable time if it could be automated.
| Train for | Path1 | Path2 | Path 3 | Path 4 | Path 5 | Path 6 | Path 7 | Path 8 | Path 9 | Path 10 |
| | 11274 | 13712 | 12698 | 14955 | 14692 | 13950 | 12002 | 13523 | 14342 | 13250 |
| | | | | | | | | | | |
| | | | | | | | | | | |
| Origin station for | Path1 | Path2 | Path 3 | Path 4 | Path 5 | Path 6 | Path 7 | Path 8 | Path 9 | Path 10 |
| | CSMT | NDLS | NZM | DLI | AI | MAU | BDTS | CZM | DEE | DEC |
Thanks in advance,
Suvasini