Hello,
I recently got Alteryx Server installed and running; and I am trying to run one big workflow not via the gallery but by using the Designer on the Server machine. I need to do this as I have to make some changes for now.
However, I see that the Designer is running at low priority, even though the Server environment itself has lot of RAM available. Because of this, it is taking too much time to complete the workflow. Can anyone help me to override this? Snapshot of the message below:
