Hi all,
I am currently working on a project and we are planning to use Alteryx for data preparation. The team is very pleased with the tool as we were able to transform our data easily with it. The only thing that we are worried about is its deployment in our environments.
We are aware that Alteryx has its own scheduler and we have tried it but we see no option in the scheduler to integrate with other scheduling tool.
What we are planning to do is to trigger the Alteryx workflows using control M as we have existing jobs in control M that should be finished first before executing the Alteryx workflows. Is this possible?
Thanks in advance.
Mhiko