Hi, I am not our server admin so I can't see inside of it, but our admin is still learning too. If I could tell her exactly what I need to do that would help a lot. We got our gallery up and running and I published our first app. I built the app to run instantly, but the job enters our general queue where it might have to sit around for a long time depending on how much else is running. I am pretty sure there is way to fix this? From what I can tell on google, I'm not sure of the difference between "workflows allowed to run simultaneously" and "assigned workers". Are they the same? Currently we let 8 run at a time. My idea is to increase that to 10 but save 2 spots that will only run gallery app jobs (so general performance is not affected and we still run 8 general jobs at a time). When I publish the app to the gallery, I see a dropdown to assign a worker (but there is nothing in the list), and I also see I can add a job tag in the gallery. It's not free text, there is a single check box option. Do I leverage one or both of these to do what I need to do? What settings in the server need to change to accomplish this? Much appreciated!!