I have a workflow (will call it X and it has 5 versions with Version 5 being the "Published" version)..
The above workflow has been scheduled to run in the early morning.
However, the scheduled run appears to be picking up a previous version of the workflow (version 3).
Anybody experienced that before? How can I trouble shoot? And, most importantly, how can I ensure that the scheduled run picks up the "Published" version, i.e. "version 5".?
Thanks,