I already have a ticket with support about this, but figured I'd post here in case anyone has any input.
High level:
- Desktop designer and gallery on 2023.2
- I am an Alteryx server admin and an admin of the physical server itself
- Workflows with google drive work from desktop designer
- Upload workflow to gallery. If manual run is done within 1.5 hours it will work. It will fail after 1.5 hours
- Scheduled gallery workflow runs within 1.5 hours of uploading and stops working after 1.5 hours
- Error received: "Connection to platform was not successful"
Further details
This seemed to start after these 2 events:
- IT applied a patch to our server, but IT says the patch couldn't have caused this. I doubt they know if that is actually the case.
- I installed V1.3.3 of the google drive tools. I also had 1.2.1, 1.30, 1.3.1 installed as well
- Whether or not 1 or both things things caused the issue I have no idea
I deleted ALL the tools from %ALLUSERSPROFILE%\Alteryx\Tools on the server as well as my .shiv folder on the server and reinstalled just 1.3.3. Same sequence of events occurred as noted in "High Level" above, so that didn't fix the issue.
I've tried it with all those tool versions noted and have the same issue with all tool versions.
I think it has something to do with google authentication, but I don't know if it's a tool issue or internal issue.. here's why
- The scheduled workflows work for 1.5 hours and then fails.
- If I open the workflow in desktop designer after it fails and click on one of the tools as soon as it opens; the tool config is blank. If I let the workflow sit for a few minutes the tool config is back.
- If I open the workflow in desktop designer after it fails, let it sit for a few minutes to let the tool config re-populate, and then close the workflow WITHOUT SAVING IT to the gallery, the manual and scheduled runs work again.... for 1.5 hours.