Currently i am trying to build a workflow which can transform the WBS level to the lowest level for every single project and sum the value from the lowest level only and it can sum up to the above level if required,
with current input when i try to visualize it sums the lower level and double the number, may be the output could be better if we have to summarize the value based on level.
