I have a workflow that has a Block Until Done and downstream under Path 1, it runs a macro. Then, it runs the 2nd path which also results in a separate macro being called. The first time I run it under Designer, it never gets to the the 2nd path, even though I can see successful results from having run the 1st path and macro. If I run it a 2nd time in Designe, it duplicates what was done in the 1st path and successfully completes the 2nd path.
Any suggestions? Thanks