Hi,
I was asked to deploy some workflows in the Alteryx server's Production environment (.yxmd file format). The workflow additionally references two Macros (.yxmc files), both of which also need to be published in the server.
In Alteryx Designer, the scripts runs without any issues.
My questions-
Q1. Do I have to submit all three at once (1 main workflow and 2 macros) or just the main workflow to the server? Is it required to upload the macros also in the server to run the main workflow?
Q2. The connection of the main script has been updated to point to the Production database. Are there any connection points I need to set up before uploading or scheduling the workflows.
Please help.